Project Detail

lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb
lorem ipsum dolor sit thumb

Project Information

  • Property Type: : Residential, Villa
  • Location: : Whitefield Bangalore
  • State: : Karnataka
  • ZIP Code: : 560066
  • Floors: : NA
  • Bedrooms: : NA
  • Bathrooms: : NA
  • Land Area: : 304920 Sq. Ft
  • Pool: : Yes
  • MLS: : NA

More Project Details

The convenience of a city with the serenity of a farm house

VDB Willow Farm has been created on a naturally sloping landscape, retaining a small island of teak trees and preserving the best of nature. VDB Willow Farm is yet inhabited by the serenity of the countryside and offers the best of two worlds – easy accessibility to the city as well as the tranquillity of an idyllic teak-wood retreat.   While in close proximity to Sigma Tech Park, ITPL, Whitefield Town, Forum Value Mall, international schools and hospitals, it’s also easily accessible from both Old Airport Road and Old Madras Road.

Designed by the noted architectural company, Zachariah Consultants,

VDB Willow Farm is set on a 7-acre charming wooded property in which just 70 units are coming up with three options – 22 Villas (5676 – 6065 sq.ft.), 32 Duplexes (3872 – 4285 sq.ft.) and 16 Simplexes ( 3578 – 3613 sq.ft.).   Villas – 4 bedrooms, home theatre, additional landscaped garden/courtyard & option to have a luxurious private pool. Duplexes – 3 bedrooms and study. Private gardens for ground floor. Simplexes – 3 bedrooms and study. Private gardens for ground floor.

This project has premium specifications as mentioned below with their relevant links. Please do visit the relevant links which are mentioned below, to see for yourself what the quality levels of our products are:-

The Modular Kitchen being sourced from a German Company called Bauformat. –http://www.sea-group.in

D Line SS work for internal / External Railings –http://www.q-railing.com

Premium sanitary wares from Toto- http://in.toto.com

Bath-tubs from Roca – http://www.roca.in

Concealed Flush Systems from Geberit – http://www.geberit.in

Textured paints from SKK – http://www.skk.com.sg

While these are just the starters, the real thing is in the tasting. The real magic is in the silence.

Additional Features
Home Summary
Kitchen Summary
Living Room
Master Suite

Tagged Features
AC in all bedrooms
badminton and squash courts
CCTV provision at main security
CentralizedVacuum System for Villas
children‘s play area and swimming pool
Courtyard and pebble court in Villas
entry and exit from basements
fully-equipped gym
Hydro Pneumatic System for water pressure
Large and exclusive clubhouse with features like table tennis and billiards facilities
lobbies and periphery of the development
Pipedgas connection from utility to kitchen
Rainwaterharvesting
Sewagetreatment plant
Water purification plant

FLOORING Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Living & Dining Italian marble / engineered marble / equivalent Italian marble or equivalent Italian marble or equivalent
Family Hardwood Flooring Engineered wood Flooring Wooden laminate
M. Bedroom Hardwood Flooring Engineered wood Flooring Wooden laminate
Guest Bedroom Engineered wood Wooden laminate Wooden laminate
Children’s Bedroom Wooden laminate Wooden laminate Wooden laminate
Kitchen / Utility Porcelain tiles Porcelain tiles Porcelain tiles
M. Toilet Anti-skid porcelain tiles Anti-skid porcelain tiles Anti-skid porcelain tiles
Other Toilets Anti-skid porcelain tiles Anti-skid porcelain tiles Anti-skid porcelain tiles
Servants’ Room Porcelain tiles Porcelain tiles Porcelain tiles
Servants’ Toilet Anti-skid ceramic tiles Anti-skid ceramic tiles Anti-skid ceramic tiles
Powder Room Marble Marble Marble
Balconies Vitrified tiles rustic series / Porcelain Vitrified tiles rustic series / Porcelain Vitrified tiles rustic series / Porcelain
Decks Flame finished granite Flame finished granite

WALL CLADDING Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Above Kitchen Counter
Glazed tiles Glazed tiles
Master Toilet Designer tiles Glass mosaic as per design Glass mosaic as per design
Other Toilets Ceramic tiles up to false ceiling Ceramic tiles up to false ceiling Ceramic tiles up to false ceiling
Servants’ Toilet Ceramic glazed tiles up to false ceiling Ceramic glazed tiles up to false ceiling Ceramic glazed tiles up to false ceiling

DOORS & WINDOWS Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Main Door Frame TW frame engineered to the width of the wall thickness with brass / SS Hardware TW frame 5 x 3 TW frame 5 x 3
Main Door Shutter Teakwood panelled Teakwood panelled Teakwood panelled
Internal Door Frame HW frame 5 x 3 HW frame 5 x 3 HW frame 5 x 3
Internal Door Shutter Polished MDF molded design Polished MDF molded design Polished MDF molded design
External Door Frames HW frame engineered to the width of the wall thickness with brass / SS Hardware HW frame 5 x 3 HW frame 5 x 3

External Door Shutter Resin coated flush shutters / painted Resin coated flush shutters / painted Resin coated flush shutters / painted
Toilet Door Shutter Resin coated flush shutters / painted Resin coated flush shutters / painted Resin coated flush shutters / painted
Window Frame UPVC frames / 3 track with mosquito mesh UPVC frames / 3 track with mosquito mesh UPVC frames / 3 track with mosquito mesh
Window Shutter UPVC with 5 min thick float glass UPVC with 5 min thick float glass UPVC with 5 min thick float glass

WALL FINISHES Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Internal Walls Premium emulsion paint Premium emulsion paint Premium emulsion paint
External Walls As per architectural detail As per architectural detail As per architectural detail
Ceiling

Designer Wall Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area Designer tiles / paint / wallpaper as per design on one wall in the living or dining or family area

STAIRCASES Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Internal

Flooring Wood Wood / Granite

Railing Stainless steel with glass Stainless steel with glass

Common

Flooring
Sadarhalli granite as per design Sadarhalli granite as per design
Railing
MS MS

ELECTRICAL Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Fans Living and Dining Living and Dining Living and Dining
Fan Point Living, Dining, all Bedrooms & Kitchen Living, Dining, all Bedrooms & Kitchen Living, Dining, all Bedrooms & Kitchen
Geyser Point Kitchen and all Toilets except Servants’ Toilet Kitchen and all Toilets except Servants’ Toilet Kitchen and all Toilets except Servants’ Toilet
Telephone / Internet Point Living and all Bedrooms Living and all Bedrooms Living and all Bedrooms
Cable TV Provision Individual DTH Individual DTH Individual DTH
Backup Power 100% 50% 50%
Switches Modular premium range Modular Modular
Air-conditioning Points Split system for Living, Bedrooms, Family and Home Theatre Split system for Living, Bedrooms & Family Split system for Living, Bedrooms & Family

PLUMBING FIXTURES & FITTINGS Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
WC in all Toilets Wall-mounted EWC with concealed cistern of Kohler or equivalent Wall-mounted EWC with concealed cistern of Kohler or equivalent Wall-mounted EWC with concealed cistern of Kohler or equivalent
WC in Servants’ Toilets EWC with cistern EWC with cistern EWC with cistern
Wash Basin in all Toilets Porcelain wash-basin on granite counter Porcelain wash-basin on granite counter Porcelain wash-basin on granite counter
Servants’ Toilet Wash-basin Wash-basin Wash-basin
Toilet Fittings Kohler or equivalent Kohler or equivalent Kohler or equivalent
Master Toilet

Glass partition with single lever divertor, rain shower &

bathtub

Glass partition with single lever divertor & rain shower

Glass partition with single lever divertor, rain shower &

bath tub

Kitchen Counter Polished granite Polished granite Polished granite
Kitchen Sink Premium branded stainless steel sink with drain board Premium branded stainless steel sink with drain board Premium branded stainless steel sink with drain board
Hot Water Connection To shower and wash-basin in toilets, sink in Kitchen To shower and wash-basin in toilets, sink in Kitchen To shower and wash-basin in toilets, sink in Kitchen
Solar-heated Water All toilets All toilets All toilets

LIFT Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Type Individual lift / Levitator 1 common lift for each wing 1 common lift for each wing

SECURITY & SAFETY Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Terminal & Main System Each home is provided a colour touchscreen console connected to a central terminal as part of the home automation system Each home is provided a colour touch screen console connected to a central terminal as part of the home automation system Each home is provided a colour touch screen console connected to a central terminal as part of the home automation system
Burglar Alarm Provision for burglar alarm system Provision for burglar alarm system Provision for burglar alarm system
Main Door Camera Colour door camera at the front door Colour door camera at the front door Colour door camera at the front door
Main Door Lock Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console Sensor-based or bio-metric proximity card-based door lock to help you control the front door through the home automation console
Curtain Control System The curtains in the formal Living area will have a motorized system with remote control The curtains in the formal Living area will have a motorized system with remote control The curtains in the formal Living area will have a motorized system with remote control
Magnetic Sensors Provided for the front door and all out-facing windows Provided for the front door and all out-facing windows Provided for the front door and all out-facing windows
Gas-leak Detector Provided in Kitchen Provided in Kitchen Provided in Kitchen
Occupancy Sensors Main lights in the M. Bathroom will be controlled by occupancy sensors Main lights in the M. Bathroom will be controlled by occupancy sensors Main lights in the M. Bathroom will be controlled by occupancy sensors

ACCESSORIES Type A & B (Villas) Type C (Duplex apartments) Type D (Single level apartments)
Cabinets in Kitchen Modular Kitchen Modular Kitchen Modular Kitchen
Wardrobe Bedrooms Bedrooms Bedrooms
Domestic Equipment Chimney, 4-burner Hob, dishwasher Chimney, 4-burner hob, dishwasher Chimney, 4-burner hob
Toilets Mirror with ply backing and edge trim Mirror with ply backing and edge trim Mirror with ply backing and edge trim

ADDITIONAL FEATURES
AC in all bedrooms
Piped gas connection from utility to kitchen
CCTV provision at main security, entry and exit from basements, lobbies and periphery of the development
Centralized Vaccum System for Villas
Courtyard and pebble court in Villas
Rainwater harvesting
Hydro Pneumatic System for water pressure
Sewage treatment plant
Water purification plant
Large and exclusive clubhouse with features like table tennis and billiards facilities, fully-equipped gym, badminton and squash
courts, children’s play area and swimming pool

VDB Home Care.

Our Promise

VDB Home Care. Our commitment towards maintaining the sanctity of your homes and surroundings ensures that you always receive the highest quality of
maintenance and services, timely and consistently. Our preventive maintenance programme is smart and cost-effective in reducing the need for repair,
thereby increasing the life of your household components and also conserving valuable energy.

General Services Maintenance Services Value-Added Services
24 Hour security Access Control Carpentry
Garbage Collection Power Backup Plumbing
Housekeeping Elevators

Landscaping Lighting

Routine Maintenance Sewage Treatment

Water Supply Water Pumps

Willow Farm Project Status Update on October – 2017

Villa #
VDB Willow Farm Status Update on Type “A” Villas

A1 Staircase and balcony – SS railing glass fixing completed,

Car porch area ramp concrete completed,

External painting – final coat completed.

A2 Mock-up Villa,

A3 Landscaping & hardscaping completed,

Balcony tiling completed,

Electrical wiring completed. Switch plates fixing is underway,

Internal door fixing completed,

Internal painting (putty) is underway,

Car porch area tiling and ramp concrete completed,

Car porch slab waterproofing & screed concreting completed,

Servent toilet – Balance area plastering completed.

Staircase SS reailing fabrication works underway.

A4 Landscaping & hardscaping completed,

Balcony tiling completed,

Electrical wiring completed. Switch plates fixing is underway,

Internal door fixing completed,

Internal painting (putty) completed, sanding is underway.

Car porch area tiling and ramp concrete completed,

Car porch slab waterproofing & screed concreting completed.

Servant toilet – Balance area plastering completed.

A5 Main door ordered,

Marble polishing completed,

Private garden area demarcation and soil filling completed

Landscaping is underway,

Bedroom toilets tiling is underway,

Car porch area tiling and ramp concrete completed,

Car porch slab waterproofing & screed concreting completed.

External painting – base coat completed texture coat is
underway.

A6 Internal painting – Second coat of painting underway,

Car porch area ramp concrete completed,

External painting – rear side painting completed. Front side
completed.

All bathrooms counter slab fixing work conpleted.

Lift switches fixing and lift commissioning is underway.

All toilets CP fixing work underway.

Solar water heater fixing completed.

A7 Interiors works is underway,

Landscaping & hardscaping is underway,

Car porch area ramp concrete completed,

Lift switches fixing and lift commissioning is underway.

Solar water heater fixing completed.

A8 Plumbing works completed,

Landscaping works is underway,

Granite fixing for entry steps completed,

Balance area stacking stone works completed,

External primer is underway,

A9 External primer completed,

Internal painting – putty is underway,

External plumbing work completed,

Granite fixing for the deck area completed,

Granite fixing for entry steps completed,

MS trellis fixing completed,

C – Channel fixing for the elevation completed.

A10 External primer completed,

Internal painting -putty is underway,

External plumbing work completed,

Granite fixing for the deck area completed,

Granite fixing for entry steps completed,

C – Channel fixing for the elevation completed.

A11 Internal plastering completed,

External plumbing works completed,

Granite fixing for entry steps is underway,

MS trellis fixing is underway,

A12 External plastering completed,

Balance internal plastering near staircase areas is underway,

MS trellis fixing is underway,

Granite fixing for entry steps completed,

C – Channel fixing for the elevation completed.

Terrace floor and all balconies waterproofing work in underway,

A14 Internal plastering near staircase completed,

External plastering completed,

Granite fixing for entry steps completed,

External plumbing works is underway,

C – Channel fixing for the elevation completed.

A15 Internal plastering completed,

External plastering completed,

External plumbing works is underway,

Granite fixing for entry steps completed,

C – Channel fixing for the elevation completed.

A16 Interiors works is underway,

CP & Sanitary fittings fixing completed,

Toilets mirror fixing is underway,

Rear side balance area landscaping completed,

Car porch area ramp concrete completed.

Wet kitchen and dry kitchen cabinet fixing work completed.

All bedrooms wardrobes fixing work completed,

Lift switches fixing and lift commissioning completed.

Solar water heater fixing completed.

A17 First floor & second floor block masonry work completed,

Electrical conduiting is underway,

Internal plastering for terrace headroom is underway.

External plastering – 90% completed,

C – Channel fixing for the elevation completed.

External primer coat is underway.

A21 Footing excavation completed. Soil dressing and slush removal
is underway,

Footing PCC is underway,

Reinforcement steel for columns, footing is underway.

A22 Footing excavation completed. Soil dressing and slush removal
is underway,

Footing PCC is underway,

Reinforcement steel for columns, footing is underway.

Simplex #
VDB Willow Farm Status Update on Type : “D” Blocks

D1 Front block entrance door fixing completed,

Electrical wiring & switch plates fixing for unit 001, 302
completed. Switch plates fixing is underway for unit no. 102,

Power testing completed for unit no. 302,

Internal doors fixing for unit no. 201 completed.

Balcony SS railing – glass fixing completed for unit no 302,
101

False ceiling works in toilets completed for unit no. 102.

Common area acid wash cleaning, grouting completed.

Common area switch plates fixing completed,

D2 D2-001 – UPVC windows fixing completed, internal painting
(putty) is underway, main door fixing completed and polishing
is underway, flooring acid wash cleaning is under way.

D2-302 kitchen cabinets fixing work completed, counter slab
fixing completed, kitchen area cladding completed.

cond floor projection slab waterproofing completed,

D2-002 – Rear side landscaping work is underway.

D2-201 kitchen area flooring tiling work completed.

Duplex #
VDB Willow Farm Status Update on Type : “C” Blocks

C1 UPVC windows fixing in unit no. 001, 002, 201 & 202 is
underway,

External painting – stone wall texture paint is underway,

Common area lobby and staircase – granite floor fixing
completed,

All toilets waterproofing and screed concrete for unit 202
completed,

Balcony waterproofing for unit 202 is underway,

Marble flooring for unit 202 completed.

C2 Common area lobby and staircase – granite floor fixing
completed,

UPVC windows fixing in unit no. 001, 002 & 201 completeds,

C2-202 – Internal painting – primer and emulsion both
completed,

C2-202 – Electrical wiring & switch plates fixing
completed. Power testing is underway,

C2-202 – Internal doors fixing completed,

C2-202 – Electrical shaft near master bedroom dress area
Block masonry and plastering completed,

C2-202 – Staircase and balcony SS railing Fabrication works is
underway.

C3 Rear side podium slab waterproofing is underway,

Primer for stone wall completed,

Common area lobby & staircase granite fixing completed,

Common area MS railing fixing is underway,

Block external painting (texture coat) is underway.

Front side planter box waterproofing is underway,

C4 Common area staircase MS railing fixing completed,

Common area lobby granite flooring & cladding completed,

C4 – Front side deck area waterproofing and granite
fixing completed, internal painting (putty) is underway,
balance area tiling completed, terrace parapet wall block
masonry & plastering completed.

C5 Front side landscaping works completed,

C5 – Final coat of painting is underway, staircase &
balcony SS railing glass fixing is completed, cabinets fixing
completed.

C5 – 202 – Staircase and balcony glass has been ordered,
balance CP & sanitary completed, counter slab cutting and
polishing in under way

Basement VDF flooring completed.

C6 Granite cladding in the common area is completed.

Basement VDF flooring completed.

C7 Granite cladding in the common area is completed.

Basement VDF flooring completed

FF, SF, TF toilets and balcony water proofing work is under
way.

C8 Front side landscaping completed,

C8-002 – Interior works is in progress,

Front block entrance door fixing completed,

C8 Block – Common area UPVC balance windows is under
production,

C8-202 – Power testing and final cleaning is underway.

Basement VDF flooring completed.

VDB Willow Farm – Status Update on : Entrance Portal

Landscaping works completed, balance area kerb stone fixing for
the pavement area completed.

VDB Willow Farm – Status Update on : Landscaping

D1 & D2 Block: Landscaping works is underway. For Villas
A01, A03, A04, A06 & A16, landscaping completed. Block
front side landscaping between blocks C5 to C8 completed.
Landscaping for front side planter in block C4 is underway.

VDB Willow Farm – Status Update on : Club House

Retaining wall shuttering & concreting for the second lift
is underway. Water proofing works for retaining wall for the
first lift of concrete completed. Balance area footings –
excavation and concreting completed. Backfilling around
retaining wall (east and west side) completed

VDB Willow Farm – Status Update on : Water Treatment Plant
(WTP)

C2 & C5 Block – WTP equipments installation and
commissioning completed. Hydro pneumatic pumps fixing,
commissioning & testing completed.

VDB Willow Farm – Status Update on : Amphitheatre

Landscaping works completed. Pathway granite laying completed.
Plants fixing completed. Electrical conduiting completed and
light fixing is completed.

VDB Willow Farm – Status Update on : Park Extension (Senior
Citizen’s Lounge)

Landscaping completed. Pathway pavers laying is underway.
Plants fixing completed. Electrical conduiting completed.
Lights fixing completed.

VDB Willow Farm – Status Update on : Cricket pitch/ Cricket
practice net

Pavement for the pathway is underway. Landscaping work
completed.

VDB Willow Farm – Status Update on : Basement

Blocks D1 & D2 Basement VDF concrete work completed. Car
park layout marking is underway. Blocks C1 & C2 basement
walls, columns painting completed. For blocks between C3 to C8,
VDF concrete works completed.

VDB Willow Farm – Status Update on : Electrical Cabling

Underground electrical cable trench excavation and hume pipe
laying completed. Inspection chamber construction completed.
All the LT & HT cables received at site and cable laying
for the blocks between D1, D2, C1, C2, C3 and C8 completed.
Airtel – OFC cabling for data, telephone & intercom
completed. Testing and commissioning complete. Airtel broadband
connection is provided to unit D2-302.

VDB Willow Farm – Status Update on : Main Road Pavement

Pathway pavers fixing completed for Blocks – D1, D2, C1 &
C2. Pavers fixing completed for blocks between C3 and C8
completed. For villas between A01 and A14 pavers fixing
completed. Main road cross pavers laying work completed.

Location Map